
F6300L glass lined reactor
Parameters Table |
Inside the device |
In the jacket | |||
Full capacity area m3 |
34.5 |
||||
Heat exchange area m2 |
/ |
44.15 |
|||
Design pressure Mpa |
0.6 |
0.6 |
|||
Design temperature °C |
200 |
200 |
|||
Steel plate material |
245R |
Q235B |
|||
Reference weight Kg |
19900(Without transmission equipment) |
||||
High voltage test (kv) |
20 |
||||
Reducer-helical gear |
RF137 |
RF147 |
|||
Motor-asynchronous explosion-proof type KW |
YB37 |
||||
frame |
DJ130 |
||||
Blender |
/ |
Pulp, impeller: |
|||
Use medium | Resistant to corrosion of various concentrations of inorganic acids, organic acids, organic solvents and weak bases (except for hydrofluoric acid, fluoride ion-containing media, concentration> 30%, temperature> 180% concentrated phosphoric acid and strong alkali) | ||||
Note: When the working temperature is less than 0°C or the design pressure is greater than 0.4, please specify when ordering |
|||||
IV nozzle table |
|||||
Symbol |
Nominal size |
Connecting flange standard |
Purpose |
||
M/sl |
DN450/125 |
/ |
Manhole (with sight glass) | ||
a |
DN200-B |
PNO. 6HG/T2105-2011 |
Spare port | ||
b |
DN200-B |
PNO. 6HG/T2105-2011 | Spare port | ||
c |
DN200-B |
PNO. 6HG/T2105-2011 | Spare port | ||
d |
DN200-B |
PNO. 6HG/T2105-2011 | Spare port | ||
e |
DN200-A |
PNO. 6HG/T2105-2011 | Stirrer port | ||
f |
DB150-A |
PNO. 6HG/T2105-2011 | Discharge port | ||
h |
DN125-B |
PNO. 6HG/T2105-2011 | Spare port | ||
s2 |
DN125-A |
PNO. 6HG/T2105-2012 | Mirror port | ||
T1~2 |
DN200-B |
PNO. 6HG/T2105-2011 |
Thermometer port | ||
L1~4 |
DN100 |
PL100 (B) -10RF |
Steam inlet (outlet) | ||
g |
G3/4" |
/ |
exhaust vent | ||
h |
G1/2" |
/ |
Keep your mouth clean |
MESSAGE


Have questions or suggestions?

National Service Hotline:+86-18953371519
Monday to Sunday: 7:30-17:00

After-sales service
Your satisfaction drives us forward
About us
The company mainly produces glass-lined equipment, first- and second-class carbon steel, stainless steel non-standard pressure vessels and glass-lined equipment maintenance and firing.